Private: Commercial
Multiuse Commercial Kitchen
This commercial kitchen is approximately 8000 sq ft. of floor space. Once complete, it will include drive in storage spaces, large commercial coolers & freezers, large dining area, cooking area complete with commercial grade appliances, storage rooms & washrooms.
Town of Pincher Creek Multi Purpose Facility Expansion Building & Waterslide
Link Builders provided General Contracting Services to the Town of Pincher Creek for the construction of a precast concrete building. The building houses a waterslide which was installed by Link Builders and is a welcome addition to the previously standing community swimming pool.
Town of Pincher Creek Water Spray Park
Link Builders provided General Contracting Services to the Town of Pincher Creek for construction of a water spray park. The environmentally friendly spray park recirculates and filters the water, so nothing goes to waste.
MD of Pincher Creek No. 9 Public Works Shop Renovations
Renovation and removal of interior walls to create a large staff lunch area including millwork and exterior windows; the renovation and re-configuration of existing bathrooms and office space; replacement of existing flooring and ceiling in renovated area & the deletion of sprinkler system.
Crestview Lodge
Link Builders completed the concrete scope for this project which included the footings, foundation walls, elevator shaft, basement floor, and all exterior concrete work.
Cameron Day Use Area Rehabilitation
Link Builders provided General Contracting Services to Parks Canada for the restoration of the Cameron Lake Day Use Area. The project included a complete demolition and reconstruction including foundations and wood framing of a concession building, washroom facilities, and covered picnic area. Also included were paved parking areas, sidewalks, signage & landscaping. This project is located in the wetlands area of a National Park & required strict environmental controls.
Multiuse Commercial Kitchen
This commercial kitchen spans approximately 8,000 square feet of floor space and is designed to support high-volume food preparation and service. Once completed, the facility will feature convenient drive-in storage areas for efficient loading and unloading of supplies. It will also include large commercial coolers and freezers to maintain proper food storage and safety standards. The space will house a spacious dining area, a fully equipped cooking zone with commercial-grade appliances, and multiple storage rooms. Additional amenities such as washrooms and organized service areas will ensure a functional and well-structured working environment.
Town of Pincher Creek Multi Purpose Facility Expansion Building & Waterslide
Link Builders provided general contracting services for the Town of Pincher Creek on the construction of a precast concrete building designed to enhance the community swimming pool facility. The project included the installation of a waterslide, which was also completed by Link Builders as part of the overall build. This new structure was carefully integrated with the existing pool infrastructure to improve functionality and visitor experience. The addition of the waterslide and new building has created an exciting upgrade for the community, offering improved recreational amenities for residents and visitors alike.
Town of Pincher Creek Water Spray Park
Link Builders provided general contracting services to the Town of Pincher Creek for the construction of a modern water spray park. The facility was designed as a fun and interactive recreational space for families and children in the community. The environmentally friendly spray park features a recirculating water system that filters and reuses water, ensuring minimal waste. This sustainable design helps conserve resources while maintaining a safe and enjoyable environment for visitors. The project has become a valuable addition to the town’s outdoor recreational amenities.
MD of Pincher Creek No. 9 Public Works Shop Renovations
This project involved the renovation and removal of interior walls to create a larger and more functional staff lunch area. The upgraded space includes custom millwork and the addition of exterior windows to bring in natural light. Work also included the renovation and reconfiguration of existing bathrooms and office spaces to improve layout and usability. Existing flooring and ceiling finishes in the renovated areas were replaced to provide a refreshed and modern appearance. The project also included the removal of the existing sprinkler system as part of the renovation scope.
Crestview Lodge
Link Builders completed the concrete scope of work for this project, delivering key structural components required for the building’s foundation and exterior. The work included the construction of footings, foundation walls, and the elevator shaft, ensuring strong structural support for the facility. The team also installed the basement floor as part of the building’s core structure. In addition, all exterior concrete work was completed to provide durable and finished outdoor surfaces. This scope of work played an important role in establishing the project’s solid structural base.
Cameron Day Use Area Rehabilitation
Link Builders provided General Contracting Services to Parks Canada for the restoration of the Cameron Lake Day Use Area. The project included a complete demolition and reconstruction including foundations and wood framing of a concession building, washroom facilities, and covered picnic area. Also included were paved parking areas, sidewalks, signage & landscaping. This project is located in the wetlands area of a National Park & required strict environmental controls.